Description
8.2kW solar kit Hyundai 410 black bifacial modules HiS-S410YH-BK, SolarEdge hybrid inverter, mounting, monitoring, accessories and permit plan. Order online or PHONE 888-498-3331
Parts / Specifications
What is included: |
Permit-ready plans, lifetime support, solar panels, inverter(s), mounting, monitoring, safety labels, accessories, manufacturer's warranty |
What is not included: |
Conduit, electrical wire, circuit breaker(s), junction boxes, concrete |
PARTS LIST: |
PARTS LIST |
Solar Panels: |
(20) Hyundai solar panel model HiS-S400YH(BK) all-black |
Optimizers: |
(20) SolarEdge optimizers P505 |
Inverter(s): |
(1) SolarEdge Home Hub hybrid model SE7600H |
Disconnect: |
AC disconnect and integrated DC safety switch disconnect box |
Monitoring: |
24/7 system monitoring |
Wires: |
(2) x 100' PV wires with MC4 connectors |
Mounting: |
IronRidge rooftop racks, portrait layout, flush mount |
Roof Anchors: |
Choose shingle roof flash-foot, universal tile hook, or metal roof base. Other mounts available as needed; additional cost may apply |
Hardware: |
Module bonding clamps, rails splices, grounding lugs, wire clips |
Safety Labels: |
NEC code compliant site map placard and safety labels |
SYSTEM SPECIFICATIONS: |
SYSTEM SPECIFICATIONS |
Maximum Power DC (Wp): |
8,000 watts DC; 8.0 kW |
Maximum Power AC (Wp): |
7,451 watts AC CEC |
Estimated Power Generated: |
967 kWh AC monthly average |
Maximum Power Voltage Vmp (V): |
240 Volts |
Maximum System Output Current Imp (A): |
32 Amps |
Minimum Required OCPD Circuit Breaker Rating (A): |
40 Amps |
Array Dimensions: |
430 square feet |
Array Weight: |
1,120 lbs |
Distributed Load: |
2.6 lbs psf |
Design Criteria: |
CRITERIA FOR DESIGN |
ASCE Stanadard: |
7-10 |
Exposure Category: |
B - urban and suburban areas, wooded areas, or other terrain with numerous closely spaced obstructions having the size of single family dwellings or larger. |
Wind Speed Rating: |
110 mph |
Snow Load: |
20 lb psf |
Anchor Spacing: |
6ft span |
Other Designs: |
Heavy duty wind or snow version available wtih additional parts and costs |
Disclaimer: |
Product specifications are dependent on manufacturer information and are subject to change without notice. |
Installation Instructions
DOWNLOADS
IronRidge ROOF mount datasheet
IronRidge roof mount Installation Manual
IronRidge GROUND mount datasheet
IronRidge GROUND mount Installation Manual
SolarEdge Home Hub inverter datasheet
SolarEdge Home Hub inverter Installation Manual
Hyundai solar panel installation manual
DIY or Full-Service Pro Solar Installation
You can choose how to install the solar panel system. You can Do-It-Yourself (DIY), hire any contractor or handyman for labor, or we can provide Full-Service Professional installation. Most customers choose DIY to save some serious money. However you decide to go solar, we will provide the permit plans, instruction manuals and lifetime technical support. You will also have the same manufacturer warranties, and be eligible for tax credits, rebates and other incentives.
Professional solar panel system installation by a state licensed contractor includes labor, wiring, electrical setup, balance of system parts, building permit, utility approval, inspection, monitoring setup, and activation. 5 year warranty on labor. Installation services are not subject to state sales tax. Final price subject to system design and site visit. Additional fees may apply for electrical panel upgrade, multiple roof areas, conduit wiring greater than 100 ft, two or more story property, or tilt mounting.
How to Install the Solar Panel Kit with String Inverter and optimizers
- Read and follow the installation instruction manuals provided with the solar panels, inverter and mounting system
- Secure the roof attachments to the roof rafters; add caulk as needed
- Attach mounting rails to the roof attachments using supplied hardware
- Attach the module optimizers to the rails using the supplied hardware
- Connect the optimizer output cables into desired strings as indicated in the electrical line drawing
- Connect the solar panel wires to the optimizers
- Secure the solar panels to the mounting rails using the supplied clamps for middle and end locations
- Connect the last PV wire to a junction box
- Connect the PV wires and a grounding wire from the junction box to the inverter
- Connect the inverter to a PV solar AC disconnect box
- Connect the PV solar disconnect box to a new circuit breaker in the household electrical box
- Contact the local building department or electric utility company to schedule inspection and connection to the grid for permission to operate
Tools Required to Install Rooftop Solar Mounting
- Tape measure
- Roofers bar, shingle ripper
- Chalk line
- Stud finder
- Caulking gun
- Sealant compatible with roofing materials
- Drill with 7/32" long-style bit
- Drill or impact gun with 1/4" or 5/16" deep socket
- Ladder, Safety harness and rope
- Wire stripper, cutter, crimping tool
- Conduit bender
- Voltage or Amp meter, testing tool
How to Install PV Solar Panel Roof Flashing Attachment
Simply slide the flashing under a row of roof shingles, drill pilot hole, apply sealant to hole, secure with bolt and attach sealing washer. Just a few minutes to install flash-foot. Watch this video for a demonstration.
Fast, Simple Universal Fastening Objects (UFO)
Comparing IronRidge XR rails to Box rails
Pro Tips to Mount Solar Rails Square on a Rooftop
How To Install SolarEdge Power Optimizers
This video gives you an overview of how to install SolarEdge power optimizers and inverters for residential installations. Learn how easy it can be to fully optimize your PV array.
SolarEdge HD-WAVE Inverter Technologies Benefits
SolarEdge HD-Wave Technology is a new approach to inverter design that delivers higher efficiency, reduces size and weight, and has lower cost.
How To Install The SolarEdge HD-Wave Inverter
This 10 minute video demonstrates how to install the SolarEdge HD-Wave inverter.