5.2kW solar kit LG 370, SolarEdge HD optimizers

(No reviews yet) Write a Review
SKU:
LG370-5kW-SolarEdge
MPN:
LG370Q1C-V5
Availability:
SHIPS 1 to 3 WEEKS
Shipping:
$500.00 (Fixed Shipping Cost)
  • 5.2kW solar kit LG 370, SolarEdge HD optimizers
  • LG 370 Solar Panel
  • SolarEdge HD Optimizers
$12,200.00

Description

This is a top performing PV system with the highest-efficiency LG 370 watt NeON R panels. The grid-tied system produces 5.2kW (5180 watts) and includes 14 LG370Q1C-V5 monocrystalline black-frame modules, SolarEdge optimizers, HD-wave inverter, 24/7 panel monitoring, integrated safety switch disconnect, rooftop mounting, permit-ready building electrical plans, and lifetime support. The 99% efficient SolarEdge HD-Wave inverters with optimizers deliver more power, even in shaded conditions, and monitoring for each panel. This LG solar power system has every component needed to get the job done for business or home energy production. Enjoy peace of mind with the best LG solar quality backed by a 25 year warranty and UL certification testing. How much does the LG370 system with SolarEdge optimizers cost? Get the lowest price with a 26% renewable energy tax credit and rebates. You can make your own power to be energy independent with this easy installation PV system. Order online or PHONE 888-498-3331


WANT A SOLAR PANEL SYSTEM AT THE LOWEST COST?  START SOLAR DESIGN


View AllClose

Parts / Specifications

What is included:
Permit-ready plans, lifetime support, solar panels, inverter(s), mounting, monitoring, safety labels, accessories, manufacturer's warranty
What is not included:
Conduit, electrical wire, circuit breaker(s), junction boxes, concrete
PARTS LIST:
PARTS LIST
Solar Panels:
Optimizers:
(14) SolarEdge optimizers P400
Inverter(s):
(1) SolarEdge HD-Wave inverters model SE5000H"
Disconnect:
Inverter integrated DC disconnect; External AC disconnect safety switch
Monitoring:
24/7 system monitoring
Wires:
(1) x 100' PV wires with MC4 connectors
Mounting:
Rooftop racks, portrait layout, flush mount (IronRidge or UniRac)
Roof Anchors:
Choose shingle roof flash-foot, universal tile hook, or metal roof base. Other mounts available as needed; additional cost may apply
Hardware:
Module bonding clamps, rails splices, grounding lugs, wire clips
Safety Labels:
NEC code compliant site map placard and safety labels
SYSTEM SPECIFICATIONS:
SYSTEM SPECIFICATIONS
Maximum Power DC (Wp):
5,180 watts DC; 5.1 kW
Maximum Power AC (Wp):
4,783 watts AC CEC
Estimated Power Generated:
626 kWh AC monthly average
Maximum Power Voltage Vmp (V):
240 Volts
Maximum System Output Current Imp (A):
21 Amps
Minimum Required OCPD Circuit Breaker Rating (A):
26 Amps
Array Dimensions:
260 square feet
Array Weight:
672 lbs
Design Load Test:
Front panel load of 5400 pascals and rear wind load of 4000 pascals
Disclaimer:
Product specifications are dependent on manufacturer information and are subject to change without notice.
View AllClose

Installation Instructions

DIY or Full-Service Pro Solar Installation

You can choose how to install the solar panel system. You can Do-It-Yourself (DIY), hire any contractor or handyman for labor, or we can provide Full-Service Professional installation. Most customers choose DIY to save some serious money. However you decide to go solar, we will provide the permit plans, instruction manuals and lifetime technical support. You will also have the same manufacturer warranties, and be eligible for tax credits, rebates and other incentives.

Professional solar panel system installation by a state licensed contractor includes labor, wiring, electrical setup, balance of system parts, building permit, utility approval, inspection, monitoring setup, and activation. 5 year warranty on labor. Installation services are not subject to state sales tax. Final price subject to system design and site visit. Additional fees may apply for electrical panel upgrade, multiple roof areas, conduit wiring greater than 100 ft, two or more story property, or tilt mounting.


DOWNLOADS

pdf-icon.pngIronRidge roof mount datasheet

pdf-icon.pngIronRidge roof mount Installation Manual

pdf-icon.pngIronRidge roof mount UL certificate

pdf-icon.png IronRidge warranty

pdf-icon.pngSolarEdge HD datasheet

pdf-icon.pngSolarEdge HD Installation Manual

pdf-icon.pngSolarEdge UL certificate

pdf-icon.pngSolarEdge warranty

pdf-icon.pngLG solar panel DATASHEET

pdf-icon.pngLG solar panel installation Manual

pdf-icon.pngLG solar panel UL certificate

pdf-icon.pngLG solar panel warranty


How to Install the Solar Panel Kit with String Inverter and Optimizers

  1. Read and follow the installation instruction manuals provided with the solar panels, inverter and mounting system
  2. Secure the roof attachments to the roof rafters; add caulk as needed
  3. Attach mounting rails to the roof attachments using supplied hardware
  4. Attach the module optimizers to the rails using the supplied hardware
  5. Connect the optimizer output cables into desired strings as indicated in the electrical line drawing
  6. Connect the solar panel wires to the optimizers
  7. Secure the solar panels to the mounting rails using the supplied clamps for middle and end locations
  8. Connect the last PV wire to a junction box
  9. Connect the PV wires and a grounding wire from the junction box to the inverter
  10. Connect the inverter to a PV solar AC disconnect box
  11. Connect the PV solar disconnect box to a new circuit breaker in the household electrical box
  12. Contact the local building department or electric utility company to schedule inspection and connection to the grid for permission to operate

Tools Required to Install Rooftop Solar Mounting

  • Tape measure
  • Roofers bar, shingle ripper
  • Chalk line
  • Stud finder
  • Caulking gun
  • Sealant compatible with roofing materials
  • Drill with 7/32" long-style bit
  • Drill or impact gun with 1/4" or 5/16" deep socket
  • Ladder, Safety harness and rope
  • Wire stripper, cutter, crimping tool
  • Conduit bender
  • Voltage or Amp meter, testing tool
  • Elbow grease and common sense

How to Install PV Solar Panel Roof Flashing Attachment

Simply slide the flashing under a row of roof shingles, drill pilot hole, apply sealant to hole, secure with bolt and attach sealing washer. Just a few minutes to install flash-foot. Watch this video for a demonstration.


Fast, Simple Universal Fastening Objects (UFO)


Comparing IronRidge XR rails to Box rails


Pro Tips to Mount Solar Rails Square on a Rooftop


How To Install SolarEdge Power Optimizers

This video gives you an overview of how to install SolarEdge power optimizers and inverters for residential installations. Learn how easy it can be to fully optimize your PV array.


SolarEdge HD-WAVE Inverter Technologies Benefits

SolarEdge HD-Wave Technology is a new approach to inverter design that delivers higher efficiency, reduces size and weight, and has lower cost.


How To Install The SolarEdge HD-Wave Inverter

This 10 minute video demonstrates how to install the SolarEdge HD-Wave inverter.


SetApp guide to the new commissioning procedure for SolarEdge Inverters

View AllClose

0 Reviews

View AllClose